Advanced fast DC
charge complex
160kW
Classic AE Wall charge complex, updated by EVA Chargers
from 40kW €8,500
to 160kW €18,500
EXW Prices
Powerful complex for mid-duration charging
The charging station is ideal for locations where people spend a short period of time resting, working, or exercising.
These locations include:
Cinema
Gyms
Office
Cafes
Grocery
Malls
Connectors and capacities
AC Input - from 50 to 210kW
DC Output - from 40 to 160kW
AC Output - from 3 to 45kW
We recommend the following hardware standards for charging stations. However, you can customize the equipment to best suit your needs. Just specify which connectors you want to see on the station when ordering.
Basic connectors for different standards
Europe
CCS Type 2
1000V / 40kW-160kW*
USA
CCS Type 1
1000V / 40kW-160kW*
Universal
CCS Type 2
1000V / 40kW-160kW*
AC Sockets (for Euro and Universal)
Type 2 socket
400V / 63A / 43kW
E-Bike socket
230V / 16A / 3.5kW
Basic set of adapters for different standards
Europe
CCS Type 2
to CHAdeMO
USA
CCS Type 1
to NACS
USA
CCS Type 1
to CHAdeMO
Universal
CCS Type 2
to NACS
Universal
CCS Type 2
to CCS Type 1
Universal
CCS Type 2
to GB/T
Universal
CCS Type 2
to CHAdeMO
* The power of the connector depends on the power of the station and the number of cars charging at the same time.
Your station in the spotlight
The design of the AE Wall charge complex has long been recognisable among customers and a favourite among owners of these charging stations. And EVA Chargers has supplemented it with a large multimedia display to make your station stand out from other complexes.
From now on, you can advertise your own business or earn passive income by broadcasting other companies' ads using your charging stations.
Communication
Information display:
LCD screen 7” in English / Italian / German / French / Spanish / Ukrainian / Polish / Czech / Macedonian / Russian / Any other language according to clients specifications
Methods of connecting the charging station to the billing system are available:
2G, 3G, 4G, LAN, Wi-Fi
OCPP protocol support:
1,6 JSON
Access and activation:
RFID cards (Mifare standard), local list memory - 10000+ cards Mobile application P&C by VIN code / credit card terminal choosed by owner
Support for the following payment methods:
Online terminal, Visa, MasterCard, American Express, Apple Pay, Google Pay
Size and installation
Mounting:
On pedestal (on a concrete base)
Charging station size (H×W×D):
83.70 x 41.85 x 12.24 inch
2,126 × 1,063 × 311 mm
Length of cables:
From 14,7 ft / 4.5 m
Charging station protection
Enclosure:
Metal galvanized and painted
Protective equipment:
The charging station is equipped with a controller with an electronic RCD (30mA, 3 phases)
Enclosure protection class IP54
Mechanical protection class IK10
Operating temperature range:
From ‐35°C to +50°C / -31°F to +122°F
Warranties and manufacturers
Warranty:
24 months
Charging station manufacturer:
Ukraine
Manufacturing components:
European Union, USA, Ukraine, Korea
CE, ISO, EAC and etc. (certification in progress)
The number of cars that can be charged at the same time:
4 cars
Tested with all EV cars and Plug-in Hybrid models
EXW Prices
We provide a wide range of charging station capacities so that you can choose the right package for you in terms of both price and power.
If necessary, you can change the configuration of the charging station and order unique branding by prior arrangement, but all touch screens must contain Eva Chargers logos, regardless of the customer's individual brand.
Additional options
+€500
Adapter kit
+€300
Advertising lightbox
+€2,000
Advertising LED screen
+€500
Placement of an individual logo on the station
Separate billing
(+10% to the cost)
If the station was on our billing or in roaming, you can disconnect it only 3 years after the station is installed.
In the future, it will be possible to add V2G and a battery with a bi-directional module (DC-DC).
When installing a bi-directional module (DC-DC) or V2G at the station, the station's power will decrease by 25% (from 40kW to 30kW per module). The maximum power of the station with these options will be 120kW.
Basic set:
1xCCS2*.
+4 adapters
CCS1, GB/T, CHAdeMO, NACS
Optional:
+1 CCS2 Connector
Smart energy distribution
+€1,000
40-100 kW PDU (UUGP 100020) 3-5 power modules
40kW
40kW
€8,500
60kW
60kW
20kW
40kW
€10,000
€11,000
80kW
80kW
40kW
40kW
€11,000
€12,000
100kW
40kW
60kW
+free connector**
€13,000
90-150 kW PDU (UUGP 50030) 3-5 power modules
90kW
90kW
30kW
60kW
€12,000
€13,000
120kW
120kW
60kW
60kW
€14,000
€15,000
150kW
60kW
90kW
+free connector**
€16,500
160 kW PDU (UUGP 100040) 4 power modules
160kW
160kW
80kW
80kW
€17,500
€18,500
Delivery time for components and manufacturing of the charging station is 60-90 days.
Depending on the season and the speed of delivery, the production time may vary, both upwards and downwards.
* The basic connector is indicated for the European and universal market. For the US market, the station is equipped with a CCS1 connector.
** It means that this configuration of the station includes 1 of the specified connectors and a reasonable distribution of energy between the connectors absolutely free of charge.
Calculation of the
station average payback
In order to calculate the payback* of a charging station, let's use the next steps:
The cost of the 160kW charging complex is €18,500
Minimum station load 10% of the day. Station charging (~2.5 h/day)
The charging station has a capacity of
200kW
Minimum net profit from sales of 1 kW
€0.2
1. Calculation of the min number of energy sales per day
Minimum operating time of the charging station
2.5h/day
Charging station capacity
160kW
Minimum electricity sales per day
400kWh
2. Calculation of the min profit from energy sales per day
Minimum electricity sales per day
400kWh
Minimum clear profit from sales of 1 kW
€0.2
Minimum profit from energy sales per day
€80
3. Calculating the payback of the station
Price of the charging station
€18,500
Minimum profit from energy sales per day
€80
Estimated payback period of the station
~232 days
According to these calculations, the estimated payback period for the plant is 232 days.
*Individual consumption per charging station may vary depending on geography, traffic corridor, proximity to highly-trafficked areas, daily load profile, etc.